HDPE Waterproofing Membrane
HDPE Waterproofing Membrane
HDPE waterproofing membrane(Non-asphalt-based,self-adhesive) is the company adopts innovative technology, mainly made of HDPE resin sheet, directly coated on the surface of extruded sheet Non-pitch polymer macromolecule hot-melt adhesive and sand anti-adhesive layer (or release film) ,is a polymer self-adhesive waterproofing membrane that is extruded at one time. The coil material has pre-shopped anti-sticking properties and can be integrated with self-waterproofing of concrete structures.
facebooktwitterlinkedingoogle+
Send Inquiry

Description

What is HDPE waterproofing membrane(Non-asphalt-based,self-adhesive)?

HDPE waterproofing membrane(Non-asphalt-based,self-adhesive) is the company adopts innovative technology, mainly made of HDPE resin sheet, directly coated on the surface of extruded sheet Non-pitch polymer macromolecule hot-melt adhesive and sand anti-adhesive layer (or release film) ,is a polymer self-adhesive waterproofing membrane that is extruded at one time. The coil material has pre-shopped anti-sticking properties and can be integrated with self-waterproofing of concrete structures.

Non-primary cement slurries in polymer self-adhesive films and post-cast concrete (or binders) penetrate through the creep phase through the anti-sticking layer under pressure to form effective interpenetrating bonds and large molecules. Force, the self-adhesive layer of the coil reacts with the liquid concrete slurry to form a gap-free combination between the waterproof and the concrete structure, eliminate hidden troubles between the layers, and effectively improve the reliability of the waterproof system.

p202407211035546067c p202407211035567afeb

 

What are the basic features of HDPE waterproofing membrane(Non-asphalt-based,self-adhesive)?

▪ Combining the advantages of polymer waterproofing membrane and self-adhesive membrane, it greatly improves the performance of puncture resistance, self-healing, high and low temperature resistance, and more stable chemical properties;

▪ Adopting self-adhesive construction technology makes construction more convenient;

▪ The self-adhesive layer adopts the environmentally friendly polymer self-adhesive developed by our company, which greatly improves the aging resistance performance;

▪ The possibility of preventing water leakage in polymer coil materials has been achieved;

▪ Safe and environmentally friendly, both polymer substrates and self-adhesive materials use environmentally friendly formulas.

 

What is HDPE waterproofing membrane (Non-asphalt-based,self-adhesive)used for?

HDPE waterproofing membrane is mainly used in waterproofing and seepage prevention projects in basements, pipe galleries, subways, tunnels, and municipal buildings.

p202407211035557c6a1p20240721103557f2b06

p20240721103600a0118

 

 

 

Technical Data Sheet

HDPE waterproofing membrane(Non-asphalt-based,self-adhesive) meets the GB/T 23457-2017 standard, with its main physical and mechanical properties

Standard GB/T23457-2017

No.

Items

P

1

Tensile properties

pull/(N/50 mm) ≥

600

Membrane breaking elongation,% ≥

400

2

Nail tear strength/N ≥

400

3

Wear resistance strength/N ≥

350

4

Static load

20kg,No leakage

5

Heat resistance

80℃,2h No displacement, flowing, dripping

6

Low temperature bending

-25℃,No crack

7

Water repellency

0.8MPa/35mm,4h Not water

8

Post-concrete concrete peel strength/(N/mm) ≥

No treatment

1.5

Immersion treatment

1.0

Sand pollution surface

1.0

UV aging

1.0

Thermal aging

1.0

9

Post-concrete concrete peel strength/(N/mm) ≥

1.0

10

Roll and roll peel strength(Overlapping edge)/(N/mm) ≥

No treatment

0.8

Immersion treatment

0.8


 

Construction technology

(1) Bottom surface construction

Clear the base layer → base surface elastic line → detail processing such as (additional reinforcement of flat facade intersection, deformation joint, pipe root, etc.) → large-area prepaid anti-sticking waterproof membrane material → coil overlap processing → node construction → self Inspection → Acceptance → Isolation film with unrolled unrolled material → Bundle reinforcement → Cast concrete

p202407211035569ce0a

p2024072110355600f83

 

 

(2) Vertical surface construction:

Install the facade support → check, clear the base surface of the façade → locate the elastic line of the coil material → detail processing such as (additional reinforcement of flat facades, deformation joints, pipe roots, etc.) → Laying the pre-paste anti-sticking waterproof membrane → do Membrane mechanical fixing → Coiled material processing → Node construction → Self-checking → Acceptance → Unrolling material barrier film without sand grain → Tied bar → Cast concrete

p2024072110355858322

p202407211035579958c

 

(3) Tunnel vault

Tunnel vaults → Lines → Installation support (gaskets or hangers) → Laying of pre-paved anti-sticking membranes → Waterproof membranes Mechanical fixing (welding or hanging) → Lapping processing → Nodal handling → Detachable waterproofing membranes → Tied bar → Cast concrete.

p20240721103557d2a6d

p20240721103557429a2

 

Packing, transportation and storage

1. The product is packaged by paper or plastic tape into rolls.

2. Preventing the sun and rain during transportation. Prohibit of approaching fire source, prevent collision, and protect the package in good condition.

3. The products should be sealed in the warehouse, stored in a ventilated and cool place, and prohibited from approaching the fire source.

4. Under normal storage and transportation condition.

p20240721103558d1df7

p20240721103558693fd

FAQ

1.Are you a factory or trading company? Where is your company located?

We are a professional manufacturer that specialized in geomembrane, geotextile, composite geomembrane, geocell, geogrid etc. with lS09001 certificate more than 20 years.

2.Can you provide a sample for us?

Yes, we can send free samples, but customer need to pay the freight.

3.Can you do OEM?

Yes, we can produce the products as your request.

4.What is your payment terms?

T/T, Western Union, Paypal, L/C…

5.What is your delivery time?

Production time usually costs 2-20 days based on the order.

6.Where is your factory located? How can l visit there?

Welcome to visit our factory and it is our great pleasure. Our factory is located is Dezhou City , Shandong Province.

7.What's your MOQ? Can l order small quantity for testing at first order?

For new client, we accept small order for building mutual trust and long-term business relationship.

 

If you have any further questions, please do not hesitate to contact us.

Send Inquiry

Submit

You Might Also Like